Construction of the new Year 7 and 8 building at Pakenham Campus is well underway. The foundation has now been poured, and the framing has begun. This facility will boast many incredible features, like acoustically treated classrooms, three metre ceiling heights, and sensor driven lighting.
Sustainability is an important thing at Beaconhills, which is why a 99,750L water harvesting system, and a 160kw solar power system are also being installed. The building has been designed with inclusivity in mind, making it highly accessible for all.